NOTE: Unit must be installed per local electrical code.
F.. DRAIN CONNECTION
1. Install splash panel on machine and hold in place with (2) screws. Do not tighten at this time.
2. Remove drain tray mounting bracket from their shipping carton.
3. Clip the drain tray mounting bracket onto the bottom of the splash panel in the brackets provided.
4. Hook the drain tray into the splash panel and onto the mounting bracket.
5. Push the drain elbow securely onto the drain tray. Do not glue in place.
6. Complete the drain hookup according to the instructions provided with unit
FIGURE 4. FLOAT ASSEMBLY
NOTE: Steps 7 and 8 to be completed only after all start up checks and adjustments are performed.
7. Replace side panels tightening all (6) screws (including splash panel screws left loose).
8. Replace top panel and front cover and secure with (2) screws.
NOTE: In those cases where the unit is base mounted and not on legs it should be sealed all around the base
with NSF listed sealant. (IMI Wilshire P/N 04815–B).
G.. AUGER ENGAGEMENT
Be certain that auger is fully engaged to lower drive and that extruding head is fully engaged to evaporator.
H.. INITIAL START UP, CHECKS & ADJUSTMENT INSTRUCTIONS
NOTE: Do not start unit before completing Installation steps A–G.
Turn on water supply and main power switch (located on top of electrical box). All IMD 30 lb. and 90 lb. series
units are equipped with a 45 second delay timer. This means that the refrigeration system will not start until 45
seconds of dispense are accumulated in the timer. Start the refrigeration system by depressing the ice dis-
pense button for 45 seconds. Make the following system checks:
NOTE: If unit will not start be sure water reservoir is full. Low water safety control must be properly adjusted to
start and shut down unit. If water level drops below bottom of reservoir, unit must shut down. Adjustment is
made by moving magnet up or down.
Water Level – If necessary adjust Float by bending float arm up or down as needed, push float assembly down
until unit stops running. Release float and unit will restart. Keep water in reservoir at level line while unit is in op-