Cornelius CH Series Instrukcja Operatora Strona 2

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 1
i
620914301
TABLE OF CONTENTS
Page
GENERAL INFORMATION 1..................................................
INTRODUCTION 1......................................................
UNPACKING AND INSPECTION 1........................................
DESIGN DATA 1........................................................
DATA PLATE INFORMATION 1...........................................
CHILLER INSTALLATION 2...............................................
LOCATION OF CHILLER 2..............................................
ELECTRICAL CONNECTIONS 3.........................................
CHILLER OPERATION 3.................................................
CONTROL PANEL 3....................................................
START UP 4............................................................
PROCESS LIQUID FLOW, UNITS WITH PUMP AND TANK (STANDARD) 4...
PROCESS LIQUID FLOW, UNITS WITHOUT RESERVOIR (OPTI ONAL) 5....
TEMPERATURE CONTROLLER OPERATION 6............................
OPTIONAL EQUIPMENT 6...............................................
CHILLER MAINTENANCE 6..............................................
CONDENSER 7........................................................
FAN MOTOR 7.........................................................
PUMP MOTOR 7.......................................................
CIRCULATION SYSTEM 7..............................................
FILTERS/STRAINERS 7................................................
TROUBLESHOOTING 9......................................................
CHILLER DOES NOT OPERATE, CONTROL POWER LIGHT “OFF” 9.........
PUMP DOES NOT OPERATE, BUT POWER LIGHT IS “ON”. 9...............
UNIT RUNS CONTINUOUSLY, BUT IS NOT COOLING PROCESS LIQUID
ENOUGH. 9............................................................
CHILLER DOES NOT OPERATE, BUT POWER LIGHT IS “ON” AND RED
SAFETY LIGHT IS “ON”. 10...............................................
W ARRANTY 18..............................................................
LIST OF FIGURES
FIGURE 1. SAMPLE DATA PLATE 1.......................................
FIGURE 2. INSTALLATION 2.............................................
FIGURE 3. CONTROL PANEL 3...........................................
FIGURE 4. CH SERIES TEMPERATURE CONTROLLER 3...................
FIG URE 5. EXTERNAL RESERVOIR WATER LEVEL 5......................
FIGURE 6. PROCESS LIQUID FLOW SCHEMATIC 11........................
FIGURE 7. REFRIGERATION SCHEMATIC 11...............................
FIGURE 8. WIRING DIAGRAM (CH 1001-A, 1501-A, 230/1/60) 12..............
FIGURE 9. WIRING DIAGRAM (CH 1001 230/1/60 FLOW SWITCH HIGH TEMP.
INTERLOCK, LOW LEVEL SWITCH) 13.....................................
FIGURE 10. WIRING DIAGRAM (CH 1501 230/3/60, 460/3/60
FLOW SWITCH HIGH TEMP INTERLOCK, LOW LEVEL ALARM) 14...........
FIG URE 11. CABINET SECTION EXPLODED VIEW 15.......................
FIG URE 12. ELECTRICAL BOX ASS’Y EXPLODED VIEW 17..................
LIST OF TABLES
TABLE 1. DESI GN DATA 1...............................................
Przeglądanie stron 1
1 2 3 4 5 6 7 ... 22 23

Komentarze do niniejszej Instrukcji

Brak uwag